Skanska- Adient
Installation of YORK ice water aggregates with a total rated power of 2.5 MW along with dry liquid coolers. Execution of the hydraulic system of the engine room in VicTaulic grooved pipe system with EPDM sealing. Installation of the central chilled water pipeline on the plant for technological processes of cooling metal processing.
Inwestor: Skanska- Adient